OK - a bit of roof is in place.
Now when it rains the water hits the partial roof over the second
floor and then runs to the unfininshed lower floor . It still
ends up in the basement, but at least the volume of water collecting
in my house (which I now think of as a huge bucket) is somewhat
reduced.
Framing of the second floor bedroom
and den/sitting room (we still don't know what to call it is moving
along.
Part of Stuart
Brannan's website. To see the entire site, click here. This page was last built on 5
June 2002. Thanks for checking it out!